Metsa Wood
The Finnish Embassy in Tokyo gets the Metsä Wood makeover in time for the Olympic and Paralympic Games in 2021.
Metsä Group and Business Finland joined forces to build a wooden pavilion in Tokyo for use during the rescheduled 2020 Olympics. The prebuilt elements ensured the rapid construction of the Metsä Pavilion; in fact, the load-bearing wooden structures were assembled in just 11 days.
This content is only available to registered CABE members and digital subscribers.
Already a member of CABE? Submit your membership number to access all web pages.
Forgotten your Member ID?
Sign up for a digital subscription to Building Engineer website
Jobs
Assistant Quantity Surveyor
Our client, a well-established multi-disciplinary consultancy, are currently seeking an Assistant Qu...
Data Collection Surveyor
Data Collection Surveyors South M25 ideal locations Aldershot / Guildford / Crawley / Maidstone A...
Quantity Surveyor
Quantity Surveyor Office based in Chesterfield with 2 days per week on site in Manchester (can be mo...
Senior Quantity Surveyor
Senior Quantity Surveyor (Aviation Civils) Salary: £70k + bonus + benefits Based: Heathrow (TW6)...